IN Brief:
- The Department for Transport is supporting 23 First of a Kind projects with £4.8 million in funding.
- The selected proposals address eight challenges including constrained worksites, structures, earthworks and digital safety assurance.
- The awards fund development and demonstration, not confirmed network-wide procurement or deployment.
The Department for Transport has committed £4.8 million to 23 railway innovation projects covering construction safety, infrastructure inspection, digital assurance and the management of earthworks. The awards form the latest First of a Kind competition, delivered with Innovate UK, and will support technology development and demonstrations rather than immediate network-wide purchases. The selected projects respond to eight challenges set by the railway industry.
Among the worksite safety proposals are EARTEX’s ZoneWarden, Distributed Analytics Solutions’ TunnelGuard and Geospatial Ventures’ GeoShield, selected under a challenge concerning simultaneous work in constrained railway environments. Tunnels, cuttings and railway possessions can bring people, equipment and changing access arrangements into limited spaces, increasing the importance of reliable movement and hazard information. The awards support development and demonstrations; they are not certifications that any of these systems can replace existing railway protection procedures.
TunnelGuard is described by its developer as a ground-air robotic safety twin for HS2 construction. Combining observations from ground-based and aerial systems with a digital representation could help teams compare activity in a work zone with the planned layout. The public project description does not specify its sensors, measurement accuracy, update frequency or proposed field-testing site. Those parameters will affect whether information is suitable for immediate operational decisions or longer-term review and planning.
Three projects focus on erosion around bridge foundations. The University of Surrey’s B-PRISM, Vessel & Vector’s DeepScour and Future Travel Studio’s bridge foundation assessment dashboard were selected under the scour challenge. Scour occurs when flowing water removes sediment or other material from a riverbed or around bridge supports, potentially undermining foundations. Assessing the risk requires an understanding of the structure, flow conditions, riverbed changes and the quality of inspection evidence; the funded proposals will seek better ways to collect or interpret that information.
AtkinsRéalis is examining digital image correlation for railway structural assessment, alongside Peak To Peak Measurement Solutions’ MABEL and TRL’s SAIN. Digital image correlation estimates deformation or displacement by comparing patterns across images taken at different times or loading conditions. Reliable field measurements depend on image geometry, camera stability, visibility and a suitable reference, and the results must be interpreted against the behaviour of the structure being assessed. The awards do not establish verified reductions in inspection time or defect detection performance.
Digital hazard records form another challenge. Digital Transit’s HazWatch, Basilicon Global’s LANTERN and an AutomateX proposal will investigate ways of recording, reviewing and reusing safety information. On complex rail schemes, hazard registers should connect risks to design decisions, identified controls and later alterations to the work. Digital tools may make those relationships easier to trace, but changes must remain auditable and responsibility for safety decisions must remain with the appropriate engineering and operational personnel.
TrackGenesis has won support for EcoRail Advisor, which proposes AI-assisted planning of earthworks resilience and biodiversity interventions. Low Carbon Materials’ Habitat Wall explores precast retaining units combining embankment support with habitat features. The two concepts involve different engineering questions: earthworks planning depends on geotechnical conditions and maintenance requirements, while retaining units must achieve the specified structural performance for the loads and soil conditions involved. The award listings include no independently verified whole-life carbon or structural-performance results for the proposed products.
Other funded areas include drone operation beyond visual line of sight, passenger reassurance in isolated environments and approaches to vegetation-related rail adhesion. Each application raises different practical constraints, including railway permissions, data integration, environmental exposure and continuing maintenance. Performance in a demonstration will not necessarily establish that a system can operate reliably across every railway location or under all traffic and site conditions.
Robok’s SiteFlow system, developed through an earlier First of a Kind project, uses existing CCTV feeds to analyse deliveries and vehicle movements around a construction site. The Department for Transport cited its previous use on HS2 when describing the value of the programme. That work is historical context, not one of the 23 newly funded projects; the latest awards list does not name Robok or SiteFlow.
The programme will fund trials and development work intended to generate evidence in railway settings. The £4.8 million total should not be divided into an assumed equal award for each of the 23 projects; individual allocations and procurement routes are not established by the summary. Network adoption would depend on the results of demonstrations, compatibility with existing railway systems and any further safety assurance or approvals required for the particular technology.



