MEDITE SMARTPLY is investing €75 million in its Clonmel plant. The programme will renew biomass, fuel handling, and drying infrastructure while removing natural gas from MDF production.
LiuGong will show electric plant at Hillhead 2026 for contractors.
Believ will deliver Hampshire’s major public EV charging programme countywide.
Imperial has advanced plans for a 30-storey Paddington hospital rebuild.
Epiroc will adapt autonomous haulage technology for quarry production operations. The LinkOA system is being developed with Heidelberg Materials for aggregates production rather than mining alone.
SANY has appointed Hassell as a material handler dealer. The agreement strengthens sales, service, and repair coverage across waste, recycling, demolition, ports, scrap, and materials handling.
GRAF has refreshed its AA rainwater harvesting product range. The systems use recycled plastic tanks and direct mains backup for non-potable building applications.
Aperture Works has launched Window Tracer for installer design workflows. The software converts site sketches into working window and door designs, sitting within a wider operating system for installers.
Origin has launched its new aluminium tilt-and-turn window system nationally. The Buckinghamshire-made product combines flush casement design, bespoke sizing, PAS 24 certification, thermal performance, and more than 150 RAL colour options.
LGH has launched its European Full Rental Partner service offer. The model combines lifting equipment hire with inspection, certification, lifting arrangement drawings, technical support, and emergency response across European markets.