HS2’s Northolt Tunnel team has completed all 34 cross passages linking the two tunnel bores under west London. Engineers will now move to secondary collars and permanent fire-rated doors before the tunnel is prepared for rail systems installation.
The Low Carbon Building Initiative has extended its European label to renovation projects, initially covering offices, collective housing, and hotels.
Construction and commissioning have been completed at the £500m Rivenhall Integrated Waste Management Facility in Essex.
Detailed approval for seven manufacturing units has moved Coventry Airport’s GreenPower Park closer to delivery as a major battery and advanced manufacturing site.
Xpedeon’s new UK Construction Systems Census suggests documentation gaps, manual handoffs, and weak live cost visibility are still delaying cash release and close-out across larger contractors.
Hyundai Construction Equipment is broadening its European offer with an eight-model launch wave that extends its Next Generation excavator push and widens its presence in adjacent machine categories.
Astec Europe has expanded its Great Britain coverage for tracked crushing and screening equipment, appointing new distributors as it pushes a wider regional growth plan.
Costain is bringing 3D-printed low-carbon concrete into a live Teesside carbon capture project, using robotic manufacturing to produce support bases for pipeline infrastructure.
Tilbury Douglas has introduced a humanoid robot to carry out site data capture and reporting tasks, opening a new test case for how automation may be used in routine construction administration.
Wills Bros has invested in a new suite of Trimble and SITECH equipment to support its A9 dualling section, signalling how digital control and site data are now being embedded into major civils delivery.