Groundforce Shorco has engineered support for a Canary Wharf basement. The hydraulic propping system serves a constrained 7m-deep excavation at 30 Marsh Wall.
Kier has secured a two-year South West Water contract extension. The £140m deal continues network services across repairs, leakage, metering, and reliability work until March 2028.
Armacell will showcase technical insulation systems at Birmingham’s InstallerSHOW 2026. Products include pipe insulation, supports, protective coverings, and elastomeric foams.
National Pile Croppers is supporting a constrained York hotel project. The work involves specialist cropping behind a retained historic façade.
Severn Trent is deploying Tracto pipe-bursting units for AMP8 renewals. The trenchless equipment will support water-main replacement with reduced excavation.
Overbury has installed bio-based wallboard at Legal & General’s headquarters. The Adaptavate product is being used in a major London retrofit.
Ravago has launched its Ravatherm XPS X FUSION insulation range. The boards target floors, inverted roofs, and higher thermal performance.
Leica Geosystems has launched three scanners for connected site workflows. The RTC300, RTC500, and RTC700 add real-time field-to-office collaboration for scanning, verification, and survey teams.
Cyber resilience is now a business continuity issue for building suppliers. Steve O’Keeffe, RVP UK&I at Epicor, explains how AI-enabled threats, supplier dependencies, ERP disruption, and board-level oversight are changing construction supply chain risk.
Apatura has submitted plans for a major Scottish data campus. The Larbert scheme would bring large-scale digital infrastructure, grid-connected development, and thousands of construction jobs to Glenbervie Business Park.