STRABAG will lead construction of a 16.3 km section of the D35 motorway in the Czech Republic, including 18 bridges and nearly 2.8 km of noise barriers.
Pagabo has opened bidding for a £4.15bn civil engineering, infrastructure, demolition, and enabling works framework due to launch in September.
Brighton’s stadium plan gives women’s football a dedicated construction brief. The proposed 10,000-capacity venue beside the Amex would create one of the world’s few purpose-built stadiums for a women’s football team.
Saltley Viaduct works will start before a complex reconstruction programme. The 183m structure will close in May before staged demolition, utility coordination, rail possessions, canal closures, and bridge replacement works linked to HS2 delivery.
Ballymore’s Silvertown plan has cleared a major planning hurdle. The Knights Road scheme will deliver nearly 1,700 homes, workspace, commercial space, community uses, park improvements, and upgraded riverside flood defences.
MLP Group is planning a 42,800 sq m two-storey logistics and industrial business park at Neufahrn near Munich.
GRAHAM has signed a pre-construction services agreement for the first phase of Muse’s Holbeche Place redevelopment in Solihull town centre.
HS2’s Northolt Tunnel team has completed all 34 cross passages linking the two tunnel bores under west London. Engineers will now move to secondary collars and permanent fire-rated doors before the tunnel is prepared for rail systems installation.
Balfour Beatty has received notice to proceed on the Middlewich Eastern Bypass. The Cheshire scheme includes a 2.5km carriageway, two major junctions, canal and rail bridges, active travel infrastructure, and delivery interfaces with Network Rail and the Canal & River Trust.
Construction and commissioning have been completed at the £500m Rivenhall Integrated Waste Management Facility in Essex.