STRABAG has secured another major European waterway infrastructure contract award. The company, ZÜBLIN, and Bauer Spezialtiefbau will deliver a €380m replacement lock on Germany’s Main–Danube Canal while keeping the route operational.
Esh Construction has completed the £6.4m Bishop Auckland Bus Station redevelopment, delivering a new accessible transport hub with local steel, sustainable technologies, and wider regeneration links.
HS2 has completed the 4,200-tonne Curzon 2 bridge structure ahead of a three-phase launch operation over the existing Birmingham–Lichfield railway line.
Webuild has started TBM excavation on Italy’s Gardena Tunnel. The works advance the Fortezza-Ponte Gardena lot on the Brenner south access route.
PERI UK has delivered bespoke reactor dome formwork at Hinkley. The system used digital modelling, prefabrication, and tie-free platforms for complex concrete works.
Glencar has started structural steelwork at Chessington World of Adventures. The £50m Minecraft-themed development is scheduled to open to visitors in 2027.
STRABAG UK expects tunnelling-led infrastructure activity to increase sharply soon. HS2, HARP, and Woodsmith are expected to drive the contractor’s next UK growth phase.
Shandong Hi-Speed Group has won a €1.3bn contract for an 83km Serbian expressway section.
Eiffage has started construction of the Grand Paris Nord university hub in Saint-Ouen-sur-Seine.
AtkinsRéalis will support Network Rail’s Wales and Western programme delivery through Control Period 7.