Panattoni has secured consent for five speculative Southampton logistics buildings. The 223,000 sq ft development will serve occupiers near the M27 and Southampton Port.
Government confidence in cladding remediation delivery has fallen to Red. Regulatory delays, construction inflation, and mounting social-housing workloads are slowing progress across thousands of affected buildings.
HG Construction wins two major student accommodation schemes from Fusion. The Cardiff and Loughborough projects will deliver 1,247 beds across a 17-storey city block and an eight-storey canalside regeneration.
Golden Valley’s funded first phase will now enter full construction. Bowmer + Kirkland is delivering a £95m innovation centre, transport hub, and enabling infrastructure for Cheltenham’s cyber and technology campus.
UKHSA has restarted procurement for its long-delayed Harlow science campus. Market engagement will shape a proposed £1.2bn package covering laboratories, headquarters accommodation, supporting infrastructure, and an energy centre.
European grants will support fifteen public infrastructure projects across regions. The €134.9m package covers rail, roads, water systems, public buildings, and transition programmes in four member states.
Merko has secured financing for Lithuania’s Rūdninkai defence campus programme. The €372.7m design-and-build package includes more than 190,000 sq m of buildings and extensive supporting infrastructure.
Yorkshire Water has secured consent for Esholt’s mixed-use development plans. The scheme combines 150 homes, biotechnology space, and energy and water supplied from the adjoining wastewater treatment works.
Arrow Point Bolton now contains two completed major industrial buildings. The 327,750 sq ft scheme combines high-capacity logistics space with rooftop solar, lower-carbon groundworks, and substantial biodiversity gains.
Linear Living has secured approval for Manchester’s latest residential tower. The 251-home scheme has an appointed main contractor, although construction remains subject to detailed design and Gateway 2 approval.