Malvern Theatres redevelopment reaches topping out

Malvern Theatres redevelopment reaches topping out

Malvern Theatres redevelopment has reached its structural topping out milestone. Contractor Speller Metcalfe will progress external enclosure and interior construction on the £20m project, which remains scheduled for completion in late 2027.


IN Brief:

  • Speller Metcalfe has marked topping out of the £20m Malvern Theatres redevelopment, which began construction in January 2026.
  • The scheme includes a 240-seat studio theatre, workshop accommodation, Forum Theatre improvements, and an accessible entrance from Priory Park.
  • The building must now progress through enclosure and fit-out while the venue maintains a reduced but continuing programme ahead of late-2027 completion.

Speller Metcalfe has marked topping out at the £20m Malvern Theatres redevelopment in Worcestershire, following the start of construction in January 2026. The ceremony brought together contractor representatives, Malvern Hills District Council, the theatre, and project partners at the new building structure. Topping out recognises the structure reaching its intended height; it is not practical completion. Exterior and interior cladding, building services, performance-space fit-out, testing, and site reinstatement remain ahead of the planned November 2027 opening.

The district council is leading the second phase of the redevelopment with Malvern Theatres, while Burrell Foley Fischer designed the works. A new 240-seat studio theatre is the principal addition, with two studios for classes and workshops at park level below it. The scheme also includes improvements to the existing Forum Theatre, a new entrance facing Priory Park, and a small outdoor amphitheatre with capacity for about 100 people. Together, the changes expand the venue’s performance and teaching space rather than replacing all existing facilities.

The new works follow a separate phase completed in July 2023, when an improved Grange Road entrance, accessible facilities, and Studio One were introduced. The latest phase has a more extensive interface with the existing operational theatre and the surrounding park. New accommodation and circulation routes must be joined to the retained building while audiences continue using other performance spaces. Malvern Hills District Council says the Festival Theatre, Cinema, Studio One, café, and other hospitality areas are continuing to operate during construction.

Speller Metcalfe says the structural phase has reached the point where work can advance on exterior and interior cladding. The subsequent programme must enclose the building, complete the various performance and circulation areas, install services, and prepare the venue for occupation. The contractor has not issued a detailed schedule for individual trades or the technical systems within the new studio. The structural ceremony provides an observable milestone, but not evidence of completed finishes, final acoustic performance, or building control sign-off.

Accessibility changes are integrated into the new park-side construction. The council says the entrance will provide more comfortably spaced steps, handrails, improved lighting, and a lift. Work inside the Forum Theatre will include revised wheelchair positions and other audience improvements. These features connect parts of the venue at different levels, so completion involves more than opening a doorway: the new routes and associated equipment have to be finished and commissioned before the affected areas can be used as planned.

Construction continues next to operating auditoria and public routes. The Forum Theatre is closed, with some events relocated, and the usual entrance from Priory Park is unavailable while a temporary alternative route is signposted. Grange Road North car park is serving as a construction compound and welfare area, removing 18 public spaces until the council’s stated October 2027 reopening target for the car park. Parts of Priory Park closest to the site are closed, while the main play area remains accessible by signed routes.

Working hours are restricted to 8am–6pm on weekdays and 8am–1pm on Saturdays. The district council says contractors will monitor noise, vibration, and dust against agreed site controls. Such measures are part of managing excavation, material deliveries, structure completion, and subsequent enclosure near a functioning public building. They do not establish that the programme is disruption-free, but they document the conditions under which work is being conducted while visitors continue to use retained facilities.

The council’s published design information calls for cross-laminated timber, electric heating and hot water, natural ventilation where feasible, and solar shading to reduce overheating. It also sets an objective of exceeding applicable Building Regulations environmental standards and providing at least 10% biodiversity net gain. These remain published design commitments; the topping out update contains no completed-building energy readings, independently certified carbon calculation, or verified final material schedule from which the achieved environmental performance could be calculated.

The project extends into the park-side shrub area next to the Forum promenade, although the council says most works remain within the existing theatre footprint. Some trees have been removed and replacement planting is planned. The new entrance and amphitheatre will alter the park boundary as well as the indoor accommodation, leaving landscaping and restoration of routes to be completed after the heavy construction activities. The main park play area is to stay open while these works continue.

Funding is provided through £20m allocated by the UK Government’s Local Regeneration Fund, previously the Levelling Up Fund, with the money ringfenced for this project. Malvern Hills District Council is leading delivery and Malvern Theatres Trust operates the venue under a long lease. The published £20m is the programme value reported by the council and contractor, not an independently verified final outturn. The council has not announced a new contract settlement or revised programme budget alongside the structural milestone.

Speller Metcalfe and the council continue to target November 2027 for completion. Bringing a 240-seat performance auditorium and associated teaching spaces into use requires coordinated seating, building services, accessibility, fire safety, acoustic treatment, and stage equipment, but no detailed fit-out procurement package has been confirmed in the latest project information. Work now advances from the completed structural height through enclosure, internal construction, commissioning, and restoration of the surrounding site before the expanded theatre can open.



  • Manchester councillors move to refuse McGoff tower

    Manchester councillors move to refuse McGoff tower

    Manchester councillors have challenged McGoff’s proposed Rochdale Road housing tower. Their minded-to-refuse vote follows objections over affordable housing, the neighbouring listed pub, and parking, with a final planning decision still outstanding.


  • Malvern Theatres redevelopment reaches topping out

    Malvern Theatres redevelopment reaches topping out

    Malvern Theatres redevelopment has reached its structural topping out milestone. Contractor Speller Metcalfe will progress external enclosure and interior construction on the £20m project, which remains scheduled for completion in late 2027.