Implenia has won major modernisation contracts in Switzerland and Germany. The CHF180m-plus package covers residential, commercial, and mixed-use building upgrades.
Urban Splash has unveiled plans for Swansea Civic Centre’s reuse. The waterfront proposal includes homes, leisure space, workspace, cafés, bars, and an aquarium.
Adur District Council has identified further Southwick housing rectification work. The delayed council housing scheme was disrupted after Westridge Construction entered administration.
BAM has completed Fife’s £88m Passivhaus Caledonia High School project. Pupils are due to move into the low-energy building after the summer break.
Blue Sky Building has won the Barbican Centre renewal role. The construction management appointment covers a £176m live-estate programme running through to 2030.
CIBSE has updated TM59 to sharpen residential overheating assessment methodology. The revised guidance strengthens design-stage checks for new homes and major refurbishments under future climate conditions.
Diageo has submitted plans for a Runcorn kegging expansion scheme. The proposed 40,000 sq ft plant would support Guinness production and packaging capacity at Murdishaw.
Building safety reform is exposing weak gateway submissions across projects. The latest steering group report warns that parts of the sector are still adapting too slowly to post-Grenfell duties.
Firma Partners will fund a major Royal Albert Dock conversion. The £113m loan supports DPK Group’s plan to turn vacant London office space into 1,085 student beds.
North Lincolnshire has replaced Scunthorpe’s long-running Lincolnshire Lakes housing plan. The new Trent Vale concept proposes six villages as the council restarts developer engagement.