Pat Munro begins £3.8m Inverness quay upgrade

Pat Munro begins £3.8m Inverness quay upgrade

Construction has begun on Inverness port’s £3.8m commercial quay upgrade. Pat Munro Construction will deliver the improvements in three phases, preparing Longman Quay for lower-emission cargo handling, shore power, and alternative marine fuels.


IN Brief:

  • The £3.8m investment will upgrade the Port of Inverness's principal commercial quay.
  • Construction will take place in three phases, maintaining operations along the 340-metre waterfront.
  • The Green Freeport-supported project is scheduled for completion by March 2029.

Pat Munro Construction has started work on a £3.8m upgrade of Longman Quay at the Port of Inverness, preparing the commercial waterfront for changes in marine propulsion, cargo handling equipment, and the provision of electricity to visiting vessels.

The investment will enable the port to accommodate cranes with lower operational emissions while preparing the quay for shore power connections and the potential introduction of alternative marine fuels.

Construction will take place in three phases, allowing the 340-metre commercial quay to remain operational throughout the programme. Completion is scheduled for March 2029.

Just under half of the project’s funding comes from the £25m seed capital allocation provided by the Scottish and UK governments to the Inverness and Cromarty Firth Green Freeport, of which the Port of Inverness is a founding member.

The upgrade addresses the infrastructure required to support changes in the operation of both visiting ships and land-based cargo handling equipment. While the mechanical requirements of lifting and transporting cargo remain broadly unchanged, the introduction of alternative power sources creates different demands on the waterfront.

Ships typically use auxiliary engines while berthed to generate electricity for onboard equipment, including ventilation, lighting, refrigeration, and other services. Shore power enables compatible vessels to obtain that electricity from land-based infrastructure instead, allowing auxiliary engines to be switched off.

The required electrical capacity depends on the types of vessel using the port and their onboard power requirements. Electrical protection, connection equipment, cable management, and compatibility between shipboard and shoreside systems must also be addressed when the infrastructure is commissioned.

The marine environment introduces additional constraints. Electrical equipment installed near the waterfront can be exposed to salt contamination, moisture, and mechanical damage arising from cargo handling activities. Its positioning must accommodate vessel movements and the operation of cranes and transport vehicles without restricting access for maintenance.

Similar considerations apply to changes in cargo handling machinery. Electrically powered cranes require suitable distribution infrastructure, while battery-powered mobile equipment needs charging facilities that can be reached without obstructing operational working areas.

The Longman Quay project is preparing the waterfront for those capabilities, although the port has not disclosed the electrical capacity, crane specifications, or alternative fuel systems that will ultimately be installed.

Incorporating new services into an existing quay requires coordination with its structural and operational characteristics. Underground electrical distribution routes, for example, must be compatible with the existing construction and anticipated loading from vehicles and equipment operating above them.

Permanent infrastructure must also remain accessible for inspection and maintenance after construction. Service routes that conflict with structural elements or frequently occupied working areas can create difficulties when equipment needs to be repaired or replaced.

Phasing the project across an operational waterfront places additional constraints on the construction programme. Temporary working areas must accommodate construction equipment and materials while preserving sufficient space for cargo operations at the remaining berths.

The availability of individual sections of the quay will influence the sequence of works, particularly where new infrastructure extends across several construction phases. Connections between completed sections must be coordinated so that installation activity in one area does not unnecessarily restrict operations elsewhere.

Preparation for alternative marine fuels introduces a longer-term requirement because fuel storage and transfer arrangements differ according to the technologies ultimately adopted by vessel operators. Their development will depend on the availability of suitable fuel supply infrastructure and the characteristics of the ships using the port.

The current project establishes the physical conditions for future investment rather than committing the port to a particular fuel technology. This provides flexibility as marine propulsion systems and the associated regulatory framework continue to develop.

The Longman Quay upgrade forms part of wider efforts to expand industrial activity around Inverness and the Cromarty Firth. The Green Freeport’s development programme seeks to attract investment associated with renewable energy, manufacturing, and supporting infrastructure, with ports providing connections between industrial facilities and maritime supply chains.

Pat Munro’s civil engineering activities in northern Scotland already include infrastructure serving industrial and port developments. Its work at Nigg Energy Park has involved heavy-duty hardstanding and drainage, both of which are important components of facilities handling large industrial equipment.

As construction progresses at Longman Quay, maintaining operational capacity will remain a central requirement of the three-phase delivery programme. The March 2029 completion target establishes the timetable for the waterfront upgrade, with the subsequent commissioning and use of shore power, alternative fuels, and lower-emission equipment determining its longer-term operational performance.



  • Canary Wharf development achieves record Passivhaus certification

    Canary Wharf development achieves record Passivhaus certification

    London’s tallest certified Passivhaus building incorporates three interconnected residential towers. The urbanest Canary Wharf development combines prefabricated façades, airtight construction, and heat recovery ventilation to meet stringent building energy performance requirements at high-rise scale.


  • Wynne begins £10m specialist training centre construction

    Wynne begins £10m specialist training centre construction

    Wynne Construction has started building a specialist Welsh training centre. The £10m development in Rhyl will expand practical education capacity for construction trades, low carbon building techniques, and automotive engineering.