Develon has expanded its 9 Series crawler excavator range with larger models, extending its latest safety and machine-control package further up the heavy plant market.
Yanmar has launched the SV10, a 1-tonne mini excavator built for confined-access work, as the manufacturer targets one of the fastest-growing parts of the European compact equipment market.
SANY has set out a deeper shift into AI-native machinery, electrification and autonomous systems, backed by a RMB 30 billion R&D commitment. The strategy points to a faster convergence of heavy equipment, software, power electronics, and connected site operations.
Holcim UK is rolling out 20 LiuGong 870HE electric wheel loaders after a year-long quarry trial, extending battery-electric loading capacity across selected aggregate and asphalt sites.
APEX and IRE have passed 180 exhibitors ahead of June.
Federservizi is widening spider-lift capacity with two new Palazzani units.
Italian equipment exports held steady as earthmoving demand offset weakness.
Tilbury will host hydrogen production tied to Lower Thames works.
Terex has launched TRAC for screening diagnostics and condition monitoring. The system is aimed at faster fault detection across vibratory equipment fleets.
CW Plant Hire has added 20 more Kubota U50-5 excavators. The fleet order builds out its 5-tonne offer for urban and confined-space work.