Plant & Equipment



  • Beckett links burner diagnostics to Heat IQ

    Remote heater diagnostics are moving into connected site equipment fleets. The update links burner controls to telematics for temporary heat, concrete curing, and ground-thaw applications.


  • WPPE adds Hiab range across Midwest

    Hiab’s Midwest expansion adds fresh reach in construction lifting markets. WPPE has joined Hiab’s new dealer network across four US states, adding truck-mounted lifting products aimed at drywall handling, loader crane work, and infrastructure jobs.


  • Mac’s expands site logistics fleet supply

    Fleet deliveries reflect tighter demands on construction transport operations. Mac’s has supplied new Volvo and DAF trucks to X-Hire and Eagle for plant, access, cabin, and welfare movements.


  • Epiroc books autonomous electric drill rig order

    Epiroc has secured a major autonomous electric drill rig order. The Africa contract covers cable-electric Pit Viper 275 E rigs valued at SEK380 million.


  • SANY and Holcim expand electric fleet partnership

    SANY and Holcim have expanded a major electric equipment partnership. The CHF100 million framework includes 100 electric machines and 20 autonomous mining trucks for deployment across global operations.


  • Hitachi adds Trimble grade control to European excavators

    Hitachi is adding factory-integrated Trimble grade control to European excavators. Dealer-backed supply and support will begin in selected markets from H2 2026.


  • Atlas Copco expands site power with hybrid generators

    Atlas Copco has introduced integrated hybrid generators for construction sites. The new range targets variable loads, lower fuel burn and tighter on-site emissions rules.


  • Beckett links burner diagnostics to Heat IQ

    An electric paver has joined low-carbon resurfacing works on A47. Recycled asphalt, electric plant and localised production are cutting project emissions.


  • Mammoet manages Hague BMU replacement in tight urban site

    Mammoet completed a complex Hague crane replacement with minimal disruption. The lift strategy was built around one setup point, strict safety controls and short closures.


  • Beckett links burner diagnostics to Heat IQ

    Sarens has completed a new benchmark in heavy lifting. The Rotterdam operation paired two giant ring cranes for continuous offshore component handling with an electric zero-emission platform.