Plant & Equipment



  • Volvo CE to close Rokbak unit

    Volvo CE is closing its Rokbak articulated hauler business unit. The Motherwell site will remain active, but articulated hauler production is expected to stop in the second half of 2026.


  • Volvo CE to close Rokbak unit

    PERI UK has launched AI-driven bespoke formwork fabrication service nationwide. The service converts 3D models into CNC-ready components and has already been used on HS2 footbridge foundations in Warwickshire.


  • Merlo adds MSM DRH to Midlands dealer network

    Merlo has expanded its UK construction dealer network in Worcestershire. Worcester-based MSM DRH will now supply Merlo telehandlers, rotating telehandlers, and construction equipment into its regional territory.


  • Bedrock targets autonomous fleets after 0m Series B

    Bedrock has raised fresh capital for autonomous construction deployment. The funding pushes total backing above $350m and supports operator-less excavator roll-outs targeted for 2026.


  • Grove retrofit targets older crane fleets

    Manitowoc has launched a retrofit upgrade for older Grove cranes. The new upFLEX system adds modern lift management and wireless sensor monitoring to rough-terrain and truck cranes built between 2002 and 2023.


  • NNH adds 120-tonne mobile crane

    NNH has added more lift capacity for tighter sites today. The company’s new Liebherr LTM 1120-4.1 brings a 66-metre boom, compact four-axle layout, and higher lifting performance for industrial, precast, and steel assembly work.


  • Machinetech adds Xwatch to UK safety range

    Machinetech has added Xwatch safety systems to its UK offering. The dealership agreement broadens access to height, slew, and rated capacity controls alongside geospatial and utility-detection technologies.


  • Caterpillar unveils Cat 319 and D8 XE

    Caterpillar has unveiled the Cat 319 excavator and D8 XE. Shown at CONEXPO-CON/AGG 2026, the 19–20 tonne compact-radius excavator targets transport-width jobs, while the D8-size dozer pairs a C15-driven generator with electric drive and assist tech, with availability planned for the second half of 2026.


  • SANY UK appoints Crowland for mobile cranes

    SANY UK has appointed Crowland Cranes to distribute mobile cranes. From March, Crowland will handle sales and support across Great Britain, backed by a new Peterborough parts warehouse and stock deliveries including 60–150 tonne all-terrains, a 45 tonne rough-terrain, and a 60 tonne telescopic crawler.


  • Flannery gains PAS 2080 carbon certification

    Flannery Plant Hire has secured PAS 2080:2023 carbon accreditation today. The company says it is the first operated plant hire business in the UK to achieve certification to the whole-life carbon management specification.