Plant & Equipment



  • Finlay readies I-130RS impact crusher debut

    Finlay will debut its I-130RS impact crusher at Hillhead 2026. The new model sits between the I-120 and I-140 ranges, targeting quarrying, mining, and construction recycling operators needing strong output with easier transport.


  • Collins adds UK-first Volvo high-reach excavator

    Collins Demolition has added the UK’s first Volvo EC500HR excavator. Supplied by SMT GB, the high-reach excavator extends demolition reach to 32 metres and supports heavier attachments for complex structural dismantling work.


  • Collins adds UK-first Volvo high-reach excavator

    Komatsu has started UK production of its PC220 excavator model. The Newcastle-built machine strengthens European supply while using digital manufacturing tools, precision scanning, and laser-based assembly technology.


  • Collins adds UK-first Volvo high-reach excavator

    Green hydrogen is powering a live National Highways compound site. Galliford Try is using the system for offices, welfare, drying space, kitchen facilities, and EV charging in Bootle.


  • Rocklyn targets industrial growth with new appointment

    Rocklyn has appointed Alex Begyinah to expand industrial structures growth. The move supports rapid-install covered capacity for manufacturing, warehousing, logistics, and facility upgrade work.


  • Collins adds UK-first Volvo high-reach excavator

    Re-flow has introduced a PAS 2080 carbon management module for its field management platform, using operational data from jobs, equipment, journeys, materials, and waste to support carbon estimation, reporting, and audit-ready workflows.


  • Develon brings smart excavators to Hillhead

    Develon will give its Series 9 DX360LC-9 and DX400HD-9 smart crawler excavators a UK debut at Hillhead 2026, with electronic hydraulics, AI-assisted safety, E-Stop technology, and productivity features aimed at quarrying and construction work.


  • Collins adds UK-first Volvo high-reach excavator

    Bachy Soletanche and Kilnbridge have launched UrbanCore, an integrated ground-to-frame venture aimed at complex urban schemes where demolition, reuse, substructure, basements, reinforced concrete, and steel frames need tighter delivery control.


  • Collins adds UK-first Volvo high-reach excavator

    Finning UK & Ireland is investing more than £200,000 in engine testing technology, strengthening rebuild capability at its Cannock operation.


  • Collins adds UK-first Volvo high-reach excavator

    PERI UK has delivered bespoke reactor dome formwork at Hinkley. The system used digital modelling, prefabrication, and tie-free platforms for complex concrete works.