Liebherr has launched AI parts support for specialist construction machines.
Faresin has signed a French telehandler distribution partnership agreement today.
Haulotte and Builder Assist are testing robotic MEWP systems onsite. The work targets overhead drilling, façade painting, coating, and other repetitive tasks carried out at height.
Volvo CE and Hitachi Energy are targeting zero-emission construction sites. Their collaboration links electric machines with clean power, charging, energy management, and operational integration for site-level deployment.
JCB will debut its largest X Series excavator at Hillhead. The 50-tonne class 520X crawler excavator expands the company’s Heavyline range for quarrying, aggregates, demolition, and recycling applications.
Hinkley Point C is moving deeper into reactor fit-out work. EDF’s latest update shows mechanical, electrical, and controls installation accelerating inside Unit 1.
BKT is positioning Multimax MP 527 for compact plant fleets. The tyre is designed for telehandlers, backhoe loaders, compact loaders, and wheel loaders operating across construction, handling, and agri-industrial environments.
SBM will target UK and Irish buyers at Hillhead 2026. The Austrian manufacturer will present hybrid-electric crushing equipment and mobile concrete production systems for quarrying, recycling, and flexible site-based concrete production.
Finlay will debut its I-130RS impact crusher at Hillhead 2026. The new model sits between the I-120 and I-140 ranges, targeting quarrying, mining, and construction recycling operators needing strong output with easier transport.
Collins Demolition has added the UK’s first Volvo EC500HR excavator. Supplied by SMT GB, the high-reach excavator extends demolition reach to 32 metres and supports heavier attachments for complex structural dismantling work.