Klaas is positioning the K910 E for urban lifting work. The electric crane combines battery operation, compact deployment, and working-platform capability for restricted sites.
Speedy Hire has reported a sharp pre-tax loss for 2026. Subdued construction activity, fleet investment, and higher borrowing costs weighed on the hire group.
FM Conway has trialled low-carbon resurfacing on the M4 corridor. The project used hydrogen and electric plant with recycled asphalt, cutting emissions by around half.
Normet has launched a new concrete sprayer for underground projects. Spraymec 2100 targets confined mining envelopes requiring safety, manoeuvrability, and repeatable spraying quality.
Hillhead 2026 has sold out ahead of its Buxton return. More than 620 exhibitors will attend the quarrying, construction, and recycling equipment show.
Hyundai will bring next-generation excavators to Hillhead for UK buyers. The machines add electro-hydraulic controls, visibility systems, and operator-assist functions.
Komatsu has launched its intelligent PC220LCi-12 excavator in Britain market. The machine brings IMC 3.0, payload capability, and automation features to the mid-size excavator class.
Groundforce Shorco has engineered support for a Canary Wharf basement. The hydraulic propping system serves a constrained 7m-deep excavation at 30 Marsh Wall.
National Pile Croppers is supporting a constrained York hotel project. The work involves specialist cropping behind a retained historic façade.
National Tool Hire has expanded into online building materials supply. Customers can now order materials alongside hired tools and equipment.