Homes England launches Warwick Bar partner search

Homes England launches Warwick Bar partner search

Homes England has begun seeking partners for Warwick Bar regeneration. The 7.84-hectare Digbeth site could accommodate up to 2,200 homes alongside creative workspace and public infrastructure, with detailed procurement arrangements still to follow.


IN Brief:

  • Homes England is seeking a development partner for the 7.84-hectare Warwick Bar site in Digbeth.
  • The mixed-use proposals envisage up to 2,200 homes alongside creative workspace, public realm and infrastructure.
  • JLL will support the procurement, with detailed partner-selection information expected in the coming weeks.

Homes England has opened a search for a development partner to lead the next housing-led phase of the Warwick Bar regeneration in Digbeth, Birmingham. The government agency says the 7.84-hectare brownfield opportunity could deliver up to 2,200 homes together with creative workspace, cultural uses and public space. The initiative was presented to the development market on 19 November at the Homes England Live event in Birmingham, with the agency confirming the partner search the following day.

Warwick Bar occupies part of Digbeth’s former industrial district between Birmingham city centre, the established creative quarter and the future HS2 Curzon Street station. The area combines older industrial premises, waterways and active businesses, so redevelopment has to be planned as an extension of the existing district rather than a self-contained housing estate. Homes England has separately selected Digbeth Loc Studios as preferred development partner for Fazeley Street. That earlier selection remains a distinct regeneration element; it does not amount to an award for the newly marketed Warwick Bar land.

Property consultancy JLL has been appointed to advise Homes England on the new partner procurement. Further information about the selection process is expected in the coming weeks. No construction contractor has been appointed through this announcement, and the authority has not disclosed a start-on-site date or an agreed delivery programme for the next phase. The immediate milestone is the search for an organisation capable of taking the site through development planning and eventual delivery.

At the same Homes England Live event, West Midlands Mayor Richard Parker signed a Place Delivery Agreement with Homes England and the National Housing Bank. The agreement is intended to support the region’s housing priorities, including affordable homes and major regeneration schemes. It covers a wider programme than Warwick Bar, spanning the Birmingham and North Solihull Gateway, Coventry Growth Arc, Black Country Growth Corridor, and Wolverhampton–Walsall Growth Cluster. The agreement does not specify finance committed to individual Warwick Bar construction packages, but establishes the wider collaboration within which the agency is marketing the site.

The proposed maximum of 2,200 dwellings indicates the potential intensity of redevelopment, although it is not a fixed construction commitment. The gross site area cannot be treated as an individual residential plot area: it must also accommodate access, streets, workspace, public realm and the infrastructure supporting a mixed-use neighbourhood. Any detailed density calculation would depend on the development parcels, building forms and eventual planning submissions. The current figures establish the intended scale, not the final number, dimensions or tenure of buildings.

The site sits within an occupied urban district and beside existing waterways, conditions that make the eventual construction sequence sensitive to access and land-use boundaries. Connections to neighbouring streets, service routes and public spaces will have to be resolved through masterplanning. Digbeth’s operating businesses and cultural venues also create an existing pattern of deliveries and pedestrian movements. Homes England has not yet published a construction traffic plan, demolition specification or temporary works strategy for the new development opportunity, and the present invitation should not be mistaken for approval of any such works.

Former industrial land also requires a reliable evidence base before earthworks or foundations are designed. Ground investigations would establish the presence of existing structures and underground services, as well as the properties of soil and groundwater. Surveys and any remediation decisions would then feed into the layout and construction programme. No contamination levels, foundation design or completed site investigation results have been published in the partner announcement. Consequently, the description ‘brownfield’ identifies the land’s development history but does not establish any specific geotechnical defect or remediation requirement.

The mix of proposed homes, workspace and cultural uses creates interface requirements extending beyond building structures. Internal circulation, emergency access, servicing and the allocation of plant space will have to work across separate occupancies. Public realm is also part of the announced scheme, meaning surface finishes, lighting, drainage, planting and future maintenance responsibilities will need to be designed with the buildings rather than considered only after their completion. Decisions made at masterplanning stage can determine whether subsequent construction phases interfere with earlier occupation.

The location between Digbeth’s creative core and Curzon Street places pedestrian access and connections with public transport within the wider design context. The announcement also refers specifically to the site’s heritage and waterways, features that would have to be incorporated into detailed designs and planning proposals. It does not identify a committed bridge, station entrance or highway contribution for the new development. Any such requirements would need to be established through the relevant design, transport and planning evidence rather than inferred from proximity to HS2.

Homes England is seeking a housing-led neighbourhood rather than a wholly residential development. Creative workspace and cultural uses sit alongside the headline potential for 2,200 homes, while public realm and sustainable infrastructure form part of the proposed place. That combination will affect the sequence in which blocks and shared infrastructure could be brought into use. A programme in which different uses open at different times would require access, servicing and public-space arrangements that remain functional between phases; no phasing plan has yet been issued with the partner search.

JLL’s appointment is for property advice on the development partner selection. The role should not be confused with the appointment of a principal contractor, design team or infrastructure delivery contractor. Future building and civil engineering opportunities will depend on how the successful partner structures the scheme, secures approvals and chooses its procurement route. The current announcement supplies neither a tender timetable for those construction packages nor a confirmed start on site. Treating the proposed dwelling figure as a contracted output would therefore overstate the position of the project.

Homes England expects to release further partner-selection information in the coming weeks. That material should establish the scope of the opportunity, the proposed selection process and the responsibilities the developer would assume. The agency has identified 7.84 hectares and a potential housing capacity, but the detailed scheme, construction approvals and delivery programme remain to be determined.



  • Homes England launches Warwick Bar partner search

    Homes England launches Warwick Bar partner search

    Homes England has begun seeking partners for Warwick Bar regeneration. The 7.84-hectare Digbeth site could accommodate up to 2,200 homes alongside creative workspace and public infrastructure, with detailed procurement arrangements still to follow.


  • A40 improvement works advance near Eynsham

    A40 improvement works advance near Eynsham

    Oxfordshire has started preparatory highway works near Eynsham and Cassington. The activity will support a new A40 park-and-ride junction, bus priority measures, and walking and cycling improvements, with main construction expected in spring 2027.