Technology



  • Haulotte and Builder Assist test robots on MEWPs

    Haulotte and Builder Assist are testing robotic MEWP systems onsite. The work targets overhead drilling, façade painting, coating, and other repetitive tasks carried out at height.


  • Eleco and SymTerra connect programme data to site records

    Eleco and SymTerra have linked programmes with site records digitally. The integration connects Asta planning data with daily evidence, inspections, progress updates, delays, and commercial events captured on site.


  • Volvo CE and Hitachi Energy target zero-emission sites

    Volvo CE and Hitachi Energy are targeting zero-emission construction sites. Their collaboration links electric machines with clean power, charging, energy management, and operational integration for site-level deployment.


  • JCB to debut largest X Series excavator

    JCB will debut its largest X Series excavator at Hillhead. The 50-tonne class 520X crawler excavator expands the company’s Heavyline range for quarrying, aggregates, demolition, and recycling applications.


  • Hinkley moves into reactor fit-out phase

    Hinkley Point C is moving deeper into reactor fit-out work. EDF’s latest update shows mechanical, electrical, and controls installation accelerating inside Unit 1.


  • JCB to debut largest X Series excavator

    BrightHy will build hydrogen production capacity for Spanish cement manufacturing. The 2MW Buñol project links construction materials with industrial decarbonisation infrastructure.


  • BKT positions Multimax tyre for compact plant

    BKT is positioning Multimax MP 527 for compact plant fleets. The tyre is designed for telehandlers, backhoe loaders, compact loaders, and wheel loaders operating across construction, handling, and agri-industrial environments.


  • JCB to debut largest X Series excavator

    SBM will target UK and Irish buyers at Hillhead 2026. The Austrian manufacturer will present hybrid-electric crushing equipment and mobile concrete production systems for quarrying, recycling, and flexible site-based concrete production.


  • Finlay readies I-130RS impact crusher debut

    Finlay will debut its I-130RS impact crusher at Hillhead 2026. The new model sits between the I-120 and I-140 ranges, targeting quarrying, mining, and construction recycling operators needing strong output with easier transport.


  • JCB to debut largest X Series excavator

    Collins Demolition has added the UK’s first Volvo EC500HR excavator. Supplied by SMT GB, the high-reach excavator extends demolition reach to 32 metres and supports heavier attachments for complex structural dismantling work.