Materials



  • Masonry body backs technical education from 14

    Masonry employers want practical construction pathways embedded throughout secondary education. New reforms would allow pupils to combine core subjects with technical learning from Year 10.


  • Grayson sculpture champions advanced brickwork skills

    A Sheffield brick sculpture combines precise geometry with traditional craftsmanship. Grayson and master bricklayer Mark Rosier created the installation to demonstrate techniques rarely accommodated on volume projects.


  • British Gypsum launches integrated firestopping range

    Gyproc Firestopping extends tested compartmentation across drylining service penetrations nationwide. The range includes sealants, collars, wraps, putties, and associated passive fire products.


  • Heidelberg scales concrete monitoring across fleet

    MixPilot will monitor concrete consistency across Heidelberg’s nationwide delivery fleet. The rollout follows live trials covering different vehicles, operating conditions, and UK concrete specifications.


  • Padeswood carbon capture groundworks pass major milestones

    Padeswood’s carbon capture build has moved into major groundworks delivery. More than 600 piles and 60,000 tonnes of aggregate now support the planned cement works capture facility.


  • Etex appoints technical lead for Siniat and Promat

    Etex has appointed Si Gibson to lead construction product testing. The new technical director will oversee Siniat and Promat as evidence, competency, interfaces, and design responsibility face closer scrutiny.


  • JN Civils opens 150tph materials recovery plant

    JN Civils has opened major materials recovery capacity in Blackpool. The new plant will process excavation waste into graded sands and aggregates at up to 150 tonnes per hour.


  • Fischer launches concrete screws for building services

    Fischer has launched concrete screws for electrical and HVAC installations. The FBS 4 and FBS 5 ranges combine removable installation, close edge positioning, and assessed fire resistance up to R120.


  • Forterra revenue falls as brick demand weakens

    Forterra’s first half sales fell as Britain’s brick market weakened further. The manufacturer maintained its full year expectations despite lower volumes, higher costs, and little evidence of an immediate recovery.


  • Doncaster brownfield remediation reaches completion

    Remediation has finished across Doncaster’s 22-acre Waterfront East Park site. The programme treated contaminated land, processed buried structures, and reused more than 32,000m³ of material.