Cemex cement has been specified for Benidorm’s TM Tower development. The lower-carbon product will be used in the foundations and structure of the 64-storey residential skyscraper.
Fabricated steelwork remains outside the revised UK tariff safeguards regime. UK fabricators warn the gap could undercut domestic constructional steel supply chains.
Paebbl has launched a near-white carbon-negative cement alternative construction material. Rebond 300 can replace conventional cement in standard mixes.
Tarmac is rolling out higher recycled-content packaging for cement products. The change covers much of its Blue Circle range.
United Infrastructure and SoilDri will target AMP8 material reuse nationally. The partnership aims to cut aggregate imports and lorry movements.
Amey unveils longer-life barriers through its Hill Smith VRS partnership. The system targets fewer interventions on National Highways routes.
Holcim UK will supply lower-carbon concrete to Birmingham’s Smithfield Lofts. The ECOPact mixes cut project carbon against the original CEM I baseline.
The UK has backed critical minerals projects with new funding. The £50m package targets extraction, processing, recycling, rare earth magnets, and demand aggregation across strategic materials.
CRH is pursuing Arcosa as infrastructure materials consolidation accelerates globally. The proposed acquisition would deepen exposure to aggregates, engineered structures, and public-works demand.
Havelar has printed a Portuguese public building in nine days. The 500 sq m project used COBOD construction printing technology.