IN Brief:
- Prologis has commenced or completed refurbishment across 2.719 million sq ft of UK industrial accommodation during 2026.
- Completed projects account for 1.61 million sq ft, with another 1.109 million sq ft undergoing refurbishment.
- The largest ongoing project covers 496,181 sq ft at Prologis Park Marston Gate.
Prologis UK has expanded its industrial building refurbishment programme to 2.719 million sq ft during 2026, representing the largest annual volume of refurbishment construction undertaken by its British operation.
The programme encompasses 18 properties, with approximately 1.61 million sq ft of refurbishment completed since January and a further 1.109 million sq ft undergoing construction. Prologis is targeting Energy Performance Certificate (EPC) ratings of A across the programme.
Much of the investment is concentrated around established logistics parks in the Midlands, where refurbishment provides an opportunity to modernise industrial accommodation while retaining existing distribution infrastructure and connections to major transport networks.
Among the completed developments is DC2 at Prologis Park Wellingborough Victoria Park, a distribution facility encompassing approximately 356,000 sq ft. Contractor Glencar and architectural practice Stephen George + Partners delivered the refurbishment following an extended period of occupation.
The project retained substantial elements of the existing warehouse while replacing or upgrading components associated with its operation. Construction included grinding and refinishing concrete floors, repairing or replacing sections of external cladding, renewing loading dock equipment, and installing replacement lighting, sprinklers, and rooflights.
The condition of existing concrete slabs can influence the commercial viability of industrial building refurbishment. Warehouse floors must accommodate repeated loading from material handling equipment alongside concentrated loads transferred through storage systems.
Grinding can remove damaged or uneven surface material, while subsequent finishing restores the surface characteristics required for warehouse operations. The appropriate extent of treatment depends on the condition of the slab, its remaining thickness, and the requirements of the proposed occupier.
Surface restoration cannot independently resolve defects arising from settlement or inadequate structural capacity. Where deterioration extends through the slab or into its supporting ground, additional investigation and potentially more substantial repair may be necessary.
Retaining serviceable slabs avoids the material demand and construction activities associated with complete replacement. On a warehouse of Wellingborough DC2’s scale, removing an existing floor would also introduce considerable logistical requirements for handling demolished concrete and delivering replacement materials.
Loading dock refurbishment introduces different technical constraints. Replacement dock levellers must accommodate the height variations and loading conditions associated with vehicles using the facility, while doors and seals must correspond with the existing structural openings.
The position of retained dock pits and surrounding floor structures can restrict the selection of replacement equipment. Where new loading infrastructure imposes different forces on existing concrete, the condition and capacity of the supporting structures must be considered during specification.
The Wellingborough refurbishment also incorporates new rooflights and LED lighting. Increasing daylight availability can reduce dependence on artificial lighting during suitable operating conditions, although the resulting energy performance depends on the distribution of natural light, operating hours, and the configuration of lighting controls.
Replacing sections of external cladding provides an opportunity to address deterioration in the building envelope without necessarily dismantling the primary steel structure. Depending on the condition of retained components, refurbishment can incorporate improvements to weather resistance, insulation, and the treatment of interfaces between external panels and existing structural elements.
Those interfaces can affect operational energy performance independently of the nominal thermal characteristics of replacement materials. Poorly detailed connections or discontinuities in insulation can allow additional heat transfer or air leakage, reducing the performance of the completed envelope.
The installation of new fire protection equipment must similarly remain compatible with the proposed building configuration. Warehouse sprinkler requirements depend partly on storage arrangements, commodity characteristics, and available water supplies, meaning that an existing system may require modification before accommodating a different logistics operation.
Prologis’s portfolio-wide EPC A target provides a common energy performance objective across buildings with varying ages and original specifications. An EPC evaluates modelled building energy performance rather than directly measuring the total energy subsequently consumed by individual occupiers.
Actual warehouse consumption can vary considerably according to operational equipment, working hours, temperature requirements, and the use of specialist installations such as automated storage or refrigeration.
The largest refurbishment currently underway is DC8 at Prologis Park Marston Gate, a 496,181 sq ft distribution facility incorporating 34 dock doors and a 12-metre clear internal height. Prologis expects to complete a programme of improvements comparable to those undertaken at Wellingborough, with accommodation becoming available in May 2027.
These refurbishment investments complement the company’s new construction activities, including its recent completion of a distribution centre at DIRFT.
Retaining existing industrial structures can reduce demand for replacement steelwork, concrete, and associated groundwork. The extent of any embodied carbon saving will depend on the materials retained, the replacement components required, and the service life achieved through refurbishment.
With approximately 1.109 million sq ft still undergoing construction, the programme will continue into 2027. Completion of the remaining buildings will increase the availability of refurbished logistics accommodation without requiring equivalent quantities of entirely new structural construction.


