Two regional contractors have secured places on Leicestershire’s maintenance framework. The agreement provides operatives, vehicles, plant, and additional delivery capacity for up to four years.
Europe’s largest tunnelling machine will drive beneath the Thames estuary. The 16.4m-diameter TBM is due to begin excavating the Lower Thames Crossing’s twin road tunnels in 2028.
Two Liebherr cranes now expand capacity at Gdynia’s container terminal. The electric-ready machines add reach, lifting performance, and operational flexibility at the Polish port.
Breedon has completed a major Welsh Slate processing plant upgrade. The £1m investment will increase output, improve consistency, strengthen safety, and reduce material waste.
Hyundai and Leica extend machine control across HD130A dozers range. The aftermarket MC1 package supports 2D and 3D configurations, including laser, total-station, and dual-GNSS guidance.
Volvo delivers electric haulers for Norwegian hydropower tunnel construction works. Four A30 Electric machines are operating for LNS at Hemsil 3, with three more scheduled to join the project.
Stevens deploys automatic braking across its new Cat 980 fleet. The two 30.9-tonne machines combine collision mitigation, people detection, surround cameras, payload weighing, and motion-inhibit protection.
CIFA has launched a compact high-reach concrete pump for Europe. The seven-section K60H combines a 60-metre-class boom with sub-10m unfolding height for constrained sites.
MGF has extended its shoring offer into mainland Europe markets. Terra Infrastructure will distribute engineered systems in three countries.
Watson & Hillhouse will join a global piling equipment platform. The deal brings together UK, Finnish, and Dutch foundation specialists.