GAP has unified mixed-fleet telematics across 10,000 connected assets nationally. The platform combines 11 manufacturer and third-party data sources.
Ecocem has completed industrial-scale precast production trials using ACT cement. Full-size fire-resistant and insulated wall panels achieved a reported 67.5% carbon reduction without fundamental factory-process changes.
JCB has expanded remote controls across selected Loadall telehandlers worldwide. Fleet operators can adjust security, speed, safety, and machine settings without visiting each site.
A battery-electric loader crane has entered specialist Dutch lifting service. The 72-tonne-metre unit provides up to eight hours of locally emission-free operation.
Bilbao’s new plant turns captured carbon and ash into aggregates. The facility could produce 125,000 tonnes of lower-carbon material annually for concrete products and infrastructure.
Monumental has raised $32m to expand robotic bricklaying across markets. Its fleet exceeds 150 machines and already operates on live UK and European construction sites.
A new national platform consolidates practical guidance for retrofit delivery. The resource brings technical reports, tools, case studies, webinars, directories, and policy material into one searchable location.
Automation has reduced one structural check from hours to minutes. Birmingham researchers and HadleyFRAME tested the tools on a modular building containing more than 18,000 connections.
Europe’s largest tunnelling machine will drive beneath the Thames estuary. The 16.4m-diameter TBM is due to begin excavating the Lower Thames Crossing’s twin road tunnels in 2028.
Two Liebherr cranes now expand capacity at Gdynia’s container terminal. The electric-ready machines add reach, lifting performance, and operational flexibility at the Polish port.