Materials



  • Travis Perkins wins Wandle materials supply

    Travis Perkins Managed Services has been appointed to supply materials for Wandle’s 7,000-home portfolio, with TPgo Data supporting repairs visibility, product tracking, and van stock planning.


  • Travis Perkins wins Wandle materials supply

    Fox Group has acquired two construction materials and civils businesses. The deals add surfacing, cold milling, in-situ recycling, and ready-mixed concrete capacity to its integrated platform.


  • Travis Perkins wins Wandle materials supply

    HSE has tightened engineered stone guidance after fatal silicosis cases. Dry cutting is now deemed unacceptable, with water suppression, lower-silica materials, RPE, and health surveillance forming the core controls.


  • Travis Perkins wins Wandle materials supply

    Holcim, Paebbl, and GOLDBECK have delivered a commercial-scale industrial floor slab in Germany using carbon-storing ready-mix concrete, replacing 15% of traditional cement with Paebbl Rebond.


  • Travis Perkins wins Wandle materials supply

    Werner Sobek has engineered a double-skin facade for Vienna’s DC Tower 2, integrating around 12,000 sq m of photovoltaic modules into the high-rise building envelope.


  • Travis Perkins wins Wandle materials supply

    Arlington Real Estate has secured approval for West Hartford Park, a 126-acre employment development near Cramlington that could deliver more than 1m sq ft of industrial, manufacturing, logistics, and innovation space.


  • FP McCann advances graphene roof tile trials

    Lower-carbon roofing has moved into factory-scale validation. FP McCann has advanced graphene-enhanced concrete roof tile trials at Cadeby, demonstrating a potential 14% reduction in cradle-to-gate embodied carbon without changing standard production lines.


  • Travis Perkins wins Wandle materials supply

    Construction buyers are facing renewed cost pressure. The S&P Global UK Construction PMI showed input cost inflation rising sharply in April, as weaker activity, shipping disruption, fuel surcharges, and fragile demand added pressure across the sector.


  • Travis Perkins wins Wandle materials supply

    Mineral Products Association figures show construction materials demand falling again in Q1, with London ready-mixed concrete volumes nearly half their 2022 level.


  • Travis Perkins wins Wandle materials supply

    Construction bodies have secured a government review of planned steel tariff and quota changes after warning that the measures could raise project costs and disrupt delivery.