Heidelberg Materials is increasing its stake in Akçansa to 79.44%, deepening its position in Turkey and strengthening its cement, aggregates, and ready-mix platform across the Mediterranean basin.
The collapse of FK’s core facade and construction businesses has thrown fresh light on how legal costs, bad debt, insurance pressure, and regulatory delay are weighing on specialist contractors.
Saint-Gobain is expanding deeper into specialist construction chemicals in Europe. Its Grouttech deal targets repair, grouting, resin, and flooring applications tied to infrastructure and refurbishment demand.
Ecocem’s Dunkirk expansion has moved further into view after a visit by EU climate commissioner Wopke Hoekstra, with the plant positioned as a major low-carbon cement production hub for Europe.
Murphy has used Ecocem ACT low-carbon concrete in permanent works at Shipley Depot, marking a notable step in the move from trial pours to embedded use on live infrastructure.
A French court has convicted Lafarge and several former executives over payments made to armed groups in Syria, sharpening focus on governance in global materials businesses.
Grayson and Vision have brought the new GripLock masonry support tool to market, aiming to cut installation time, reduce handling risk, and simplify a repetitive but awkward part of façade and masonry support work.
The Mineral Products Association says rising tax costs and weak demand are constraining investment across the producers that underpin housing and infrastructure delivery.
Siderise has launched a dedicated firestop and cavity barrier range for precast concrete cladding systems, targeting challenging façade interfaces where access, tolerances, and installation conditions can complicate compliance.
Tadweld has warned that the UK’s new steel trade measure could raise raw-material costs for domestic fabricators while leaving a route for tariff-free pre-fabricated imports.