A2Dominion will invest £16m in warmer homes and resilience upgrades. The programme covers insulation, heating, ventilation, damp prevention, energy performance, and climate-adaptation measures across its housing stock.
Staticus has secured the façade package for Vista South Bank. The contract adds a major closed-cavity façade scope to one of London’s largest commercial redevelopment schemes.
Michelmersh will wind down Charnwood as brick despatches weaken nationwide. The move reflects uneven housebuilding demand, cost pressure, and tighter capacity decisions across UK construction materials.
BrightHy will build hydrogen production capacity for Spanish cement manufacturing. The 2MW Buñol project links construction materials with industrial decarbonisation infrastructure.
BKT is positioning Multimax MP 527 for compact plant fleets. The tyre is designed for telehandlers, backhoe loaders, compact loaders, and wheel loaders operating across construction, handling, and agri-industrial environments.
SBM will target UK and Irish buyers at Hillhead 2026. The Austrian manufacturer will present hybrid-electric crushing equipment and mobile concrete production systems for quarrying, recycling, and flexible site-based concrete production.
Finlay will debut its I-130RS impact crusher at Hillhead 2026. The new model sits between the I-120 and I-140 ranges, targeting quarrying, mining, and construction recycling operators needing strong output with easier transport.
Recticel has opened a Belgian plant for industrial PIR recycling. The facility will turn insulation waste into recycled polyol for new high-performance boards.
Forterra is adding surcharges as materials cost pressure returns again. Brick and concrete product pricing will be affected from June after rises in diesel, transport, and natural gas costs.
Armacell has published EPDs for ArmaComfort acoustic insulation products range. The declarations give specifiers verified lifecycle data for building services noise-control applications.