Manchester names 15 suppliers for £1bn construction framework

Manchester names 15 suppliers for £1bn construction framework

Manchester has selected fifteen contractors for its regional construction framework. The North West Construction Hub arrangement covers public building projects worth £8m and above, with three contract value bands and an estimated £1bn procurement ceiling.


IN Brief:

  • Manchester City Council has appointed 15 suppliers to the North West Construction Hub High Value Construction Framework.
  • The three lots cover individual projects valued at £8m–£18m, £18m–£45m and more than £45m, with commencement planned for January 2027.
  • The framework's aggregate estimated value is £1bn excluding VAT, but no individual supplier is guaranteed a share of that expenditure.

Manchester City Council has appointed 15 suppliers to the next North West Construction Hub High Value Construction Framework, establishing contractor panels for major public sector building projects across the region from January 2027.

The council published the award notice on 21 October 2026, following procurement through an open procedure. The arrangement divides construction work into three value bands, allowing participating organisations to select an appropriate procurement route for projects of different financial scales.

Lot 1 covers construction contracts valued from £8 million to £18 million, Lot 2 covers £18 million to £45 million, and Lot 3 applies to projects exceeding £45 million. The lots are differentiated by contract value, although the technical requirements of individual developments will still determine the construction capabilities and resources needed.

The framework has an estimated aggregate ceiling of £1 billion excluding VAT, comprising £230 million for Lot 1, £320 million for Lot 2 and £450 million for Lot 3. These amounts represent the anticipated capacity of the procurement arrangement rather than expenditure already committed to specific building projects.

Suppliers named in the award records include BAM Construction, Bowmer and Kirkland, Equans Regeneration, Eric Wright Construction, F Parkinson, GMI Construction Group, Henry Brothers, John Graham Construction, Kier Transportation, McLaren Construction, Morgan Sindall Construction and Infrastructure, Robertson Construction Group, Seddon Construction, Vinci Building and Wates Construction.

Several suppliers have been appointed to more than one lot, reflecting their capability to compete for projects across different contract values. The allocation of contractors to individual panels determines their eligibility for future work under the corresponding framework procedures; it does not constitute a construction contract for any particular building.

The arrangement is scheduled to begin on 4 January 2027 and run for three years to January 2030, with the option to extend for another 12 months. The potential extension accounts for the framework’s 2027–2031 designation, although the additional year is not an unconditional commitment.

The new framework will cover public buildings undergoing new construction, demolition, development, refurbishment and remodelling. These activities may involve creating entirely new accommodation or altering existing premises to address changes in use, capacity, building condition or operational requirements.

Manchester City Council has undertaken the procurement on behalf of the North West Construction Hub, which provides access to construction frameworks for eligible public organisations. Individual clients will remain responsible for establishing the requirements, funding and approvals for projects they bring forward through the arrangement.

Framework appointment creates a preselected pool of suppliers operating under an agreed procurement structure. When a public body has an eligible project, it can use the framework’s permitted procedures to appoint a contractor, subject to the applicable requirements and the information needed to define the proposed works.

The procurement documentation provides for direct awards and further competition between eligible suppliers. The method adopted for a particular project will depend on the framework rules and the client’s requirements, with competition potentially needed where project-specific proposals must be evaluated.

Framework participation can reduce the need to repeat elements of the initial supplier assessment for each new project. Nevertheless, the contractor responsible for construction must still be appointed to an identifiable scope of work, with the contract price, programme and allocation of responsibilities established through the relevant project arrangements.

The three lots also provide a way to organise procurement according to project scale. A £10 million building refurbishment can require substantially different site resources from a development exceeding £45 million, even though both may involve similar categories of structural and building services work.

Contract value is not a complete measure of engineering complexity. Alterations to an occupied building can involve temporary access arrangements, service diversions and restrictions on when noisy or disruptive work may be undertaken, while a new development may present more substantial requirements for foundations, structural construction and infrastructure connections.

Existing buildings can introduce uncertainty where information about hidden fabric or installed services is incomplete. Structural investigations, building surveys and examinations of mechanical and electrical systems may be necessary before the construction scope can be accurately defined.

These investigations influence both the price and programme proposed by the contractor. Where surveys identify deterioration, undocumented alterations or limitations in existing infrastructure, the project team may need to revise the works before committing to a construction sequence.

New-build schemes present a different range of dependencies. Ground conditions, planning requirements, site access and utility capacity can affect how construction proceeds, while the design of the structure and building services must be sufficiently coordinated to support procurement and installation.

The framework can provide a route for early contractor involvement where the relevant contractual arrangements allow it. Bringing construction expertise into project development may help a client assess buildability, temporary works requirements, material procurement and the effect of construction activity on adjoining buildings or services.

That involvement does not remove the responsibilities of designers, clients and contractors under construction legislation. Technical design and construction risk must still be managed through the duties and contractual arrangements applicable to each project.

The original procurement evaluation gave weight to several considerations beyond price, including technical quality, social value and environmental performance. Such criteria provide a basis for assessing prospective framework suppliers, although the outcome of an individual project will depend on its own requirements and the controls applied during delivery.

Public building contracts frequently involve measurable social and environmental commitments. Their implementation may require contractors to record local employment activity, construction waste, energy use or other agreed performance information, but the precise reporting requirements will depend on the framework and project contract provisions.

Commercial conditions will also influence the work ultimately awarded. Changes in labour availability, subcontractor capacity and material costs can affect project budgets between initial planning and the commencement of construction. Framework selection alone does not fix the price of every future contract.

The North West Construction Hub has operated successive procurement arrangements to support construction investment across the region. The new high-value framework provides continuity for eligible organisations commissioning major projects, alongside separate procurement routes intended for work at other values.

Its delivery record will emerge as clients bring forward funded schemes and select contractors from the appropriate panels. The October award establishes the participating suppliers and procurement structure, but does not identify a complete schedule of projects to be built under the new arrangement.

With supplier appointments confirmed, the next milestone is the intended start of the framework on 4 January 2027. Individual construction starts, expenditure and completion dates will follow through subsequent project procurement rather than arising automatically from the £1 billion framework award.



  • Manchester councillors move to refuse McGoff tower

    Manchester councillors move to refuse McGoff tower

    Manchester councillors have challenged McGoff’s proposed Rochdale Road housing tower. Their minded-to-refuse vote follows objections over affordable housing, the neighbouring listed pub, and parking, with a final planning decision still outstanding.


  • Malvern Theatres redevelopment reaches topping out

    Malvern Theatres redevelopment reaches topping out

    Malvern Theatres redevelopment has reached its structural topping out milestone. Contractor Speller Metcalfe will progress external enclosure and interior construction on the £20m project, which remains scheduled for completion in late 2027.