Recycled tyre drainage system wins BBA innovation award

Recycled tyre drainage system wins BBA innovation award

A recycled rubber drainage system has won BBA innovation recognition. Civil Water Management will receive assessment services worth approximately £50,000 to support the development of independently assessed construction product information.


IN Brief:

  • Civil Water Management manufactures its modular drainage system using at least 90% waste-derived material.
  • The award provides access to assessment and certification services valued at approximately £50,000.
  • Full-scale testing at the National Highways Test Centre has previously examined hydraulic and structural performance.

Civil Water Management has won the British Board of Agrément’s (BBA) first Sustainable Innovator Award for a modular drainage system made from recycled tyre rubber, securing access to assessment services intended to support wider construction product specification.

Announced at London Build on 25 November, the award provides a route into assessment and certification valued at approximately £50,000. The BBA selected the Yorkshire engineering company’s Modular Drainage System from six shortlisted innovations and confirmed the result on 26 November.

At least 90% of the material used in the system is waste derived. Granulated rubber recovered from tyres is bonded using a cold-cure polyurethane resin, creating a permeable product with connected voids through which water can pass. The resulting modules can be arranged in different configurations according to the drainage duty and installation location.

Civil Water Management has developed its technology for surface and subsurface water management, including applications in which sections of existing highway drainage can be retained. The approach is intended to reduce excavation and reconstruction by improving water collection and transfer without replacing serviceable infrastructure unnecessarily.

Water entering a road pavement through joints, cracks or the surrounding ground can weaken unbound foundation materials. Where drainage channels or subsurface collection systems cease to function effectively, retained moisture can contribute to deterioration even when the road surface itself remains largely intact. Assessing the existing system’s condition is therefore an important part of selecting a rehabilitation technique.

The company’s Hydrotrench product literature identifies drainage modules with approximately 45% void space. Unlike loose aggregate, bonded rubber retains the geometry of the individual units during handling and installation. Different panels, troughs and slabs can be combined to suit the available space, with the drainage arrangement designed to discharge into appropriate downstream infrastructure.

Civil Water Management has previously undertaken full-scale trials at the National Highways Test Centre. The validation programme examined the hydraulic capacity of the system, its structural performance and the practicality of installing it within a representative highway drainage arrangement. The test programme included simulated extreme rainfall, providing a means of investigating water transfer under controlled conditions rather than relying solely on observations from live projects.

The manufacturer also offers hydraulic modelling information and equivalent pipe sizes to support drainage design. Those parameters allow engineers to compare the capacity of a modular installation with that of conventional drainage infrastructure, taking account of the cross-section of the flow path, gradients and the anticipated volume of water entering the system.

The modular approach differs from conventional drainage trenches containing perforated pipes surrounded by granular material. In the latter arrangement, water passes through the aggregate and enters the pipe before being conveyed towards a discharge point. A permeable module can provide both collection and conveyance functions, depending on its geometry and connections. Design still needs to allow for the capacity of the receiving network.

Civil Water Management has also developed configurations for civil engineering and active travel applications. Along paths and cycleways, a drainage system must be compatible with the construction depth available beneath or beside the route, and with the requirement to collect water without undermining the supporting layers. The company identifies opportunities to adapt its modules to the dimensions of individual installations.

Reducing excavation during highway maintenance could lower the volume of material requiring transportation, disposal or processing. It can also reduce the quantity of replacement aggregate needed to reinstate a trench. These potential savings depend on the condition of the infrastructure being retained and the extent of work necessary to connect the new modules to the existing network.

Independent product assessment will need to establish the conditions under which the system is suitable for its intended applications. Hydraulic performance is only one part of the evidence required: the response of modules to loading, their durability and the installation details necessary to preserve drainage capacity are also relevant to highway specification. The award does not itself establish certification or confer approval for every proposed use.

By bringing its assessment resources to the development programme, the BBA is providing a route for a smaller construction product manufacturer to build the evidence required by designers and specifiers. The next step for Civil Water Management is to progress through that process, drawing on its previous testing and installation experience to establish the scope of any eventual certification.