IN Brief:
- Morgan Sindall and Bowmer & Kirkland hold the high value appointments, while R G Carter holds the low value appointment.
- The FAC-1 alliance connects contractors operating through two regional lots of Construction Framework 2025.
- The agreements run from 28 October 2026 to 31 December 2031, with specific school construction work requiring separate appointments.
The Department for Education has appointed Morgan Sindall, Bowmer & Kirkland and R G Carter to a construction alliance covering school building work in Essex. The arrangement brings together contractors from high and low value bands of Construction Framework 2025, establishing a collaborative structure that will operate until 31 December 2031.
Morgan Sindall Construction and Infrastructure and Bowmer & Kirkland have been appointed under High Value Band Lot 2, while R G Carter holds the corresponding Low Value Band Lot 6 appointment. The agreements are structured as Framework Alliance Contracts under the FAC-1 form, connecting the participating contractors within a common programme arrangement.
The Department for Education awarded the contracts on 26 October, with their stated commencement date falling on 28 October 2026. The published records identify the participating companies and the duration of the alliance, providing the contractual basis for cooperation across projects subsequently brought forward through the department’s construction framework.
Construction Framework 2025 provides a route for public bodies to procure school building works from contractors already selected for regional and value-based lots. The Essex Alliance connects suppliers whose framework appointments cover different project scales, allowing programme coordination while retaining the procurement requirements governing each individual scheme.
High Value Band Lot 2 covers the South region, while Low Value Band Lot 6 covers the East of England. The department’s framework handbook identifies a core high value threshold of £12m or above, or new-build accommodation exceeding 2,600 square metres of gross internal floor area, with flexibility available under the framework’s allocation rules.
The low value band generally covers schemes between £4.4m and £12m, with extensions up to £15m and other flexibility where the framework conditions permit. Project value, building size and the circumstances of the proposed work influence the band through which a contractor can be appointed.
Bringing the two bands into the Essex Alliance provides a common arrangement for contractors involved in different categories of school construction. A major replacement secondary school can present different procurement, design and delivery demands from a smaller school extension, although both may require coordination with the same education estate objectives and programme arrangements.
The FAC-1 contract establishes a multi-party framework for collaboration. Participating organisations can agree common objectives, programme activities and performance arrangements while retaining the separate construction contracts needed to deliver individual projects.
The separation allows project-level responsibilities to be defined according to each school’s requirements. A contractor undertaking one scheme will need an agreed scope, programme and commercial arrangement, while the alliance can support coordination and shared working practices across the wider programme.
School construction depends on the relationship between design development, site constraints, procurement and the operational requirements of education facilities. Projects may involve the replacement of existing buildings, the addition of teaching accommodation or improvements to specialist facilities, with each category placing different demands on the construction programme.
Where work takes place at an occupied school, building activities must be organised around the continued operation of the premises. Construction traffic, access to teaching areas, temporary utilities and the timing of disruptive operations can influence the sequence of site works and the arrangement of temporary facilities.
Replacement school projects may also require a phased transition between old and new accommodation. The new building must be completed, serviced and commissioned before pupils can transfer, after which demolition or other work can continue on the vacated parts of the site.
These recurring requirements provide opportunities for contractors to share experience across projects. Approaches to construction sequencing, technical design coordination and specialist procurement can be considered within the alliance, while the specific arrangements for each school will still be established through its own design and delivery process.
The department’s framework permits different routes to contractor appointment. Depending on the circumstances, projects may proceed through mini-competitions or direct allocation, using procurement procedures described in the Construction Framework 2025 handbook.
Those procedures include early contractor engagement and two-stage design and build arrangements where the applicable conditions are satisfied. Contractor involvement during feasibility can support cost planning, construction methodology and the development of project information before the principal construction contract is agreed.
The Essex Alliance provides a further mechanism for coordinating contractors across these project routes. Its FAC-1 structure is intended to support cooperation between participating organisations, including the transfer of relevant delivery experience and the development of shared programme objectives.
The published alliance records assign a nominal value of £1 to each award. That administrative figure is associated with the framework alliance agreements and does not represent the construction expenditure expected across future Essex school projects.
Construction values will arise as individual schemes are developed and commissioned. Their budgets will depend on the buildings required, funding available and the technical and commercial arrangements established through the relevant procurement process.
Morgan Sindall and Bowmer & Kirkland already participate in the department’s high value South regional lot, while R G Carter holds a position in the low value East of England lot. The alliance combines those framework relationships within a common arrangement specifically identified with the Essex programme.
The contracts are scheduled to continue to the end of 2031, providing a multi-year period for project coordination and the development of collaborative working arrangements. Individual construction opportunities will still depend on the Department for Education and other eligible framework users bringing forward defined schemes through the applicable procedures.
The appointments establish the alliance’s contractor membership across its two value bands. As Essex school projects progress, separate contractual decisions will determine their construction scopes, delivery responsibilities and programmes, with the FAC-1 agreement providing the framework for coordination between the participating businesses.


