Expedition Engineering and Format Engineers have launched Re-Bridge, a digital platform designed to support direct reuse of structural steel bridge components.
Develon has launched new Series 9 smart crawler excavators during its Demo Days event near Prague. The showcase included electro-hydraulic machines, autonomous excavation, electric excavators, visibility systems, and a compact demolition excavator for confined-space work.
Capital Concrete has supplied a lower-carbon calcined clay concrete for use at Brent Cross Town. The mix replaced 30% of cement with calcined clay and delivered a 10% embodied carbon saving compared with equivalent concrete mixes previously used on the development.
HS2’s Northolt Tunnel team has completed all 34 cross passages linking the two tunnel bores under west London. Engineers will now move to secondary collars and permanent fire-rated doors before the tunnel is prepared for rail systems installation.
The Low Carbon Building Initiative has extended its European label to renovation projects, initially covering offices, collective housing, and hotels.
Construction and commissioning have been completed at the £500m Rivenhall Integrated Waste Management Facility in Essex.
Detailed approval for seven manufacturing units has moved Coventry Airport’s GreenPower Park closer to delivery as a major battery and advanced manufacturing site.
Xpedeon’s new UK Construction Systems Census suggests documentation gaps, manual handoffs, and weak live cost visibility are still delaying cash release and close-out across larger contractors.
Hyundai Construction Equipment is broadening its European offer with an eight-model launch wave that extends its Next Generation excavator push and widens its presence in adjacent machine categories.
Astec Europe has expanded its Great Britain coverage for tracked crushing and screening equipment, appointing new distributors as it pushes a wider regional growth plan.