Winvic will launch an ESG whitepaper at UKREiiF, calling for regulatory backing to accelerate adoption of the UK Net Zero Carbon Building Standard.
JLG Power Towers has introduced new accessories for low-level access platforms, targeting safer handling of boards, pipes, strut, and threaded rod during fit-out work.
WSP will support National Highways’ Water Quality Plan, targeting high-risk road run-off outfalls across the strategic road network.
JCB INTELLISENSE has won Hire Industry Product of the Year, recognising an AI camera-based pedestrian detection system for Loadall telehandlers.
GeoPura, the Port of Tilbury, Toyota, JCB, and supply-chain partners have demonstrated hydrogen production, refuelling, and site power applications linked to Lower Thames Crossing delivery.
Fluke has launched SmartTrace for connected underground utility locating workflows. The 2082 Series can trace buried services, detect faults, and pair with PointMan for geolocated digital documentation.
Raimondi has entered telecrawler lifting with the Terex TTC 70. The new crane line expands the group’s product range and targets compact, uneven, infrastructure, and energy sites.
HD Hyundai has placed autonomous excavation onto an active site. The Real-X equipped 22-tonne machine will work on a Swiss civil engineering project with KIBAG and Gravis Robotics.
Dalkia’s UK recovery reflects stronger demand for technical energy services. The EDF-backed contractor lifted turnover, profit, cash, and order book as nuclear, healthcare, systems integration, and decarbonisation work supported performance.
MLP Group is planning a 42,800 sq m two-storey logistics and industrial business park at Neufahrn near Munich.