IN Brief:
- Civil construction is under way at Vulcan's Landau Lithium Extraction Plant in Germany following the completion of initial bulk earthworks.
- The current scope covers foundations, equipment support structures, tank farm, roads, drainage, and utility infrastructure before building erection and equipment assembly.
- Lionheart targets first lithium production in the second half of 2028, with stated annual capacity of 24,000 tonnes of lithium hydroxide monohydrate.
Vulcan Energy Resources has begun civil construction at its commercial Lithium Extraction Plant in Landau, Germany, advancing the first phase of its integrated Lionheart lithium and geothermal energy project. The milestone follows early bulk earthworks and precedes the erection of buildings and installation of processing equipment.
The current construction scope includes concrete foundations and structural works for buildings, equipment bases, utility installations, and the planned tank farm. Contractors are also developing site roads and drainage infrastructure. Vulcan identifies the next major stage as erection of the buildings and delivery and assembly of process equipment, rather than commissioning or production at the current stage.
Landau’s extraction plant is one part of a wider project that links geothermal wells, energy production, lithium recovery, and downstream chemical conversion. The plant is intended to produce a lithium chloride intermediate from geothermal brine. That intermediate will subsequently be processed into battery grade lithium hydroxide at a separate chemical facility at Frankfurt-Höchst. Those separate locations require interconnected plant development and a reliable flow of feedstock and intermediate material before commercial output can be achieved.
Moving from bulk earthworks to permanent foundations changes both the construction sequence and the level of dimensional coordination required. Ground preparation provides a suitable platform, while foundations must support specified permanent loads and align with equipment layouts, building frames, pipe connections, and maintenance access. The company has not published the structural design, foundation depths, or concrete quantities for this phase. Those details should therefore not be inferred from the broad list of civil packages.
Equipment foundations carry different requirements from ordinary building floor slabs. Processing equipment may impose concentrated loads, and its position needs to correspond with the layout of process lines, tanks, pumps, and electrical services. Alignment and tolerances must be coordinated with the plant design before the equipment arrives. Vulcan’s announcement confirms that equipment bases are in the current scope, but does not specify individual machines or their loads.
Tank foundations and containment arrangements must also interface with the process layout and the surrounding civil works. Tank locations can affect support requirements, access for maintenance, and how contained liquids are routed through the facility. Drainage is likewise a separate design consideration from merely providing hardstanding: the final arrangements need to account for rainwater, site levels, and the operational requirements of the finished plant. No specific tank capacities, drainage discharge arrangements, or containment designs are disclosed in the latest construction milestone.
Site roads must support construction access and eventually the circulation requirements of the operating facility. Heavy deliveries can make the distinction between temporary construction access and the final site road layout particularly important, although the company has not disclosed the delivery sequence or transport loads for the forthcoming process equipment. The roads, utilities, and concrete structures will have to be completed in a sequence compatible with the subsequent building and installation works.
Lionheart is designed to use geothermal brine for both lithium recovery and the generation of renewable energy. Vulcan plans to apply its proprietary VULSORB adsorption technology to recover lithium chloride before downstream conversion. The company targets annual production capacity of 24,000 tonnes of lithium hydroxide monohydrate, which it equates to material for around 500,000 electric vehicle batteries. That is a design target, not verified output from the still-unfinished commercial plant.
Across the integrated project, Vulcan targets annual co-products of 275 GWh of renewable electricity and 560 GWh of heat for local consumers over an estimated 30-year operating life. Those figures describe the intended integrated operation, rather than energy currently being supplied by the new extraction facility. Energy production and chemical processing depend on multiple connected assets and cannot be treated as complete merely because work on one site’s foundations has begun.
Vulcan’s September-quarter account recorded earlier bulk earthworks, relocation of a 110kV overhead line, and preliminary tank farm preparation at the extraction site. It also reported progress on the geothermal plant’s foundations and civil works. The 16 November milestone is therefore a distinct construction stage within an active programme, rather than the project’s first physical work on the ground.
Vulcan maintains a target of first production in the second half of 2028 and describes construction progress against its existing programme. Its announcement does not publish revised capital expenditure, the full civil package values, or an independent schedule assessment. The next construction test will be whether the foundations and infrastructure are delivered to the requirements of the subsequent building and process equipment installation packages.
Building erection and the delivery and assembly of process equipment are the next disclosed construction stages. Commercial output remains dependent on the commissioning of the extraction facilities and the separate downstream conversion plant, not simply the completion of concrete works at Landau.



