IN Brief:
- Landsec expects committed development exposure to fall from about £1.1bn a year earlier to approximately £200m by March 2027.
- The developer says London office construction costs have risen by 41% over five years while prime office capital values have been broadly flat.
- Thirty High in Victoria is running up to six months late following a testing and commissioning issue, now resolved according to Landsec.
Landsec plans to avoid significant new development commitments for approximately 18 months as construction cost inflation and weak returns reduce the attraction of speculative building projects. In its half-year results, the developer said committed development exposure is expected to fall to around £200m by March 2027, compared with about £1.1bn a year earlier.
London office construction costs have increased by 41% over the past five years, according to the company’s assessment, while capital values for prime offices have been broadly flat. Higher construction expenditure therefore cannot be assumed to generate an equivalent increase in the completed property’s value. Landsec considers investment in its existing office and retail estate to offer better returns than committing large sums to additional speculative developments.
The group has £133m of capital expenditure remaining on committed projects, including major office developments in London and Manchester and smaller retail works. Its committed pipeline lists £38m still to spend at Thirty High in Victoria and £83m at Republic in Manchester, with a further £12m across retail projects. These are costs remaining to complete work already undertaken or committed, not funding set aside for future speculative schemes.
Thirty High is a 299,000 sq ft office redevelopment with an estimated total development cost of £453m. Completion has slipped by up to six months following an issue encountered during testing and commissioning. Landsec says the problem has been resolved and does not expect the delay to have a material effect on the project’s total development cost or earnings guidance, partly because tenant fit-out work can proceed before the revised completion date.
The Thirty High delay arose during testing and commissioning, when installed building systems are checked and integrated ahead of handover. Problems identified at this stage can require investigation, correction and renewed testing, even when much of the physical construction is complete. Landsec has not specified the system involved or attributed responsibility to any equipment supplier or contractor, and says the issue has been resolved.
In Manchester, Republic at Mayfield is the other principal office development in the committed pipeline. The 246,000 sq ft scheme has a total development cost of £155m, with £83m still to spend and completion targeted for the fourth quarter of Landsec’s 2028 financial year. The group expects committed development exposure to decline further when Thirty High is completed, leaving Republic and smaller retail projects as the principal construction commitments.
Demand for Landsec’s recently completed prime London offices remains strong despite the retreat from new development. Three schemes — Timber Square, Myo King’s Cross and a smaller office in Oval — were together 88% let or under offer at the half-year point, compared with 54% in May. That leasing progress supports income from existing assets, while the cost and risk of committing capital to another construction project remain separate investment considerations.
For the six months to 30 September 2026, like-for-like net rental income increased by 6.2%, while EPRA earnings were unchanged at £192m. IFRS pre-tax profit rose to £243m from £98m, helped by valuation movements. Those results show that income from the standing portfolio can improve even while the company reduces the scale of its construction pipeline.
Landsec has consequently directed attention towards refurbishment and improvements at existing properties. One proposed investment is a £38m programme at New Street Square in London, including air source heat pumps and public realm changes. Such works involve a different construction profile from a new office tower: existing structures and occupier requirements shape the design, access and installation sequence, while the developer can retain an income-producing asset rather than dispose of it to finance new building.
Major retail destinations are also receiving capital. Following the reporting period, the company spent £611m on acquisitions involving Metrocentre in Gateshead and a further interest in Bluewater in Kent, partly financed through new equity. The group regards these purchases and improvements to operating assets as more attractive uses of capital under current market conditions.
Its residential development pipeline remains under pressure. Landsec has already abandoned a proposed residential-led redevelopment of Lewisham Shopping Centre, while large schemes at Finchley Road in London and Mayfield in Manchester remain under review. Neither is expected to start before 2028, taking account of design development, building safety approvals, enabling work and project viability.
A 41% rise in London office construction costs against broadly unchanged capital values has reduced the margin between the cost of a new project and the likely worth of the finished asset. Financing costs and delivery risk further influence that assessment, even where expected rents are rising. Landsec will continue existing projects and targeted upgrades, but its next major development commitment depends on returns becoming more attractive than those available from its standing portfolio.



