Kori progresses £43m Chigwell care home construction

Kori progresses £43m Chigwell care home construction

Kori Construction is building a new £43m Hallmark care home. The 110-bed Manor Road development includes specialist therapy facilities, 15 independent living suites and landscaped grounds, with opening expected during 2028.


IN Brief:

  • Kori Construction was appointed to Hallmark’s 110-bed Manor Road care home in September and marked groundbreaking in October 2026.
  • The £43m project includes a hydrotherapy pool, physiotherapy facilities, sensory landscaping and 15 independent living suites.
  • The completed home is expected to open in 2028, while the contractor forecasts £31.84m in social value associated with delivery.

Kori Construction is building a £43m care home for Hallmark Luxury Care Homes on Manor Road near Woodford Bridge and Chigwell. The 110-bed development will combine residential, nursing and dementia care with specialist wellbeing facilities, with opening expected in 2028. Kori was appointed in September 2026 and broke ground in October, with construction continuing towards the expected 2028 opening.

The development occupies part of a former Guide Dogs for the Blind site and is planned as a care facility with dedicated clinical, leisure and communal spaces. It will include a wellbeing suite with a hydrotherapy pool, gym and therapy room, supported by an on-site physiotherapy service. Landscape plans incorporate sensory gardens, a tai chi deck and accessible outdoor areas. Project sources have not published the building’s structural system, number of storeys or technical construction method.

Alongside bedrooms for residential, nursing and dementia care, Hallmark plans 15 furnished suites under its Residences concept. The suites will provide a living area, kitchenette and en-suite facilities, with access to services and communal spaces. Plans also include a café, cinema, hair salon and other resident amenities. The combination of specialist care and more independent accommodation creates different operating and servicing requirements, although the client has not published how individual zones are laid out or separated within the building.

The hydrotherapy pool will require careful coordination of pool structure, heating, water treatment, ventilation and accessible circulation. Warm, humid pool spaces also place demands on moisture control and the protection of adjacent building fabric. These are standard considerations for facilities of this type, not confirmation of the equipment or finishes selected in Chigwell. Hallmark and Kori have not released the pool dimensions, plant capacities, water-treatment method or ventilation design for this project.

Movement between bedrooms, assisted bathrooms, therapy rooms and communal areas will be central to the care home’s eventual operation. Building services and access layouts must accommodate residents with different levels of mobility while providing routes for staff, deliveries, cleaning, waste handling and maintenance. No project-specific accessibility schedule or fire strategy has been made public, so the precise arrangements and compliance solutions cannot be established from the appointment announcement alone.

Kori’s social value plan forecasts £31,838,000 of activity-related value through local hiring, regional suppliers, apprenticeships, training and community initiatives. The sum is a projection using the contractor’s assessment framework, not direct construction expenditure or an economic benefit already achieved. Kori has pledged to work with local suppliers, but the company has not published its subcontract awards, apprenticeship outcomes or a breakdown explaining how the social value total will be measured after completion.

The proposed landscaped grounds are intended to provide accessible routes and activities for residents, including sensory planting and outdoor exercise areas. Their delivery will have to be coordinated with building access, drainage, maintenance and the needs of people who may require assistance moving around the site. Neither contractor nor client has identified a landscaping subcontractor or published a site-specific surface-water design. The garden proposals therefore describe intended facilities rather than a verified ecological or drainage performance outcome.

Hallmark has described the Manor Road project as its fourth care home in Essex, adding to an existing local portfolio. The new home is expected to support approximately 150 operational jobs when it opens, a projection separate from employment during construction. Kori is also delivering care projects elsewhere, but the £43m investment figure applies to this development alone. No peak site workforce, subcontractor count or completed-construction percentage has been confirmed.

The contractor first confirmed its appointment in September and formally marked the construction start on 19 October. Earlier project details identify a two-acre site previously used by Guide Dogs for the Blind, with planning permission obtained before construction. The client and contractor have provided no more recent structural or installation milestones. Construction is under way towards an anticipated 2028 opening, with specialist care areas and associated building services still to be delivered.

The specialised care spaces, pool plant, accommodation and outdoor amenities will all need completion and commissioning before Hallmark can receive residents. The project partners have not supplied a more precise opening date, structural completion target or technical commissioning timetable. The next substantive construction update will be the achievement of an identifiable work stage, such as completion of the building frame or installation of specialist services, rather than a restatement of the October groundbreaking.