VASO’s recycled-glass panels have joined PfH Scotland’s SHED 5 framework. Eco-Genics (Holdings) is listed as a supplier on the £500m, three-year arrangement that runs from 29 January 2026.
Forza Doors has won a £500k package for 105 Victoria. The Westminster scheme is targeting BREEAM Outstanding and WELL Platinum as a fully electric, net-zero office development, with Forza supplying fire doors plus washroom doors and panels from FSC-certified timber.
St Helens has backed phase two at Parkside Colliery site. The hybrid consent opens the way for enabling, access, drainage, and infrastructure works across the former colliery at Newton-le-Willows, supporting a further tranche of logistics and manufacturing floorspace within the Liverpool City Region Freeport.