McLaren wins £55m Walworth Corners contract

McLaren wins £55m Walworth Corners contract

McLaren Construction will deliver Walworth Corners under a £55m contract. The south London scheme combines 283 student beds, 20 social rent homes, retained structure, community space and an all electric design, with completion targeted for spring 2028.


IN Brief:

  • McLaren Construction has been appointed to the £55m Walworth Corners development, with enabling work already under way.
  • The scheme combines 283 student beds and 20 social rent homes with retained structure, community space and new public realm.
  • Walworth Corners targets BREEAM Excellent and uses an all electric design with air source heat pumps and photovoltaic generation.

McLaren Construction has been appointed main contractor for Walworth Corners, a £55 million mixed-use scheme on Walworth Road in south London combining student accommodation, social rent housing, retail and community space.

The 134,000 sq ft development will provide 283 student beds and 20 social rent homes on a 0.34-hectare brownfield site at 182–202 Walworth Road. Enabling works are under way and completion is targeted for spring 2028.

Walworth Corners is the first project being delivered through the Sustainable Communities London joint venture established by Fabrix and PATRIZIA in 2025. Fabrix has also secured £69.5 million of development finance from Aviva Investors, giving the scheme institutional equity, development debt and a main contractor as it moves into construction.

The design combines new construction with retention and extension of part of the existing concrete frame facing Walworth Road. Current contractor appointment material says this approach is expected to cut structural embodied carbon by about 21%, while the wider scheme is targeting BREEAM Excellent and a 144% biodiversity net gain.

The development will be all electric, using air source heat pumps and photovoltaic generation. Green and blue roofs form part of the sustainable drainage strategy, while a new courtyard garden and public route through the site are intended to increase permeability between Walworth Road and the development’s internal spaces.

Retaining an existing frame alters the construction sequence from the outset. Surveys and structural verification have to establish what can remain, where strengthening is required and how new elements will connect to the retained concrete. Dimensional tolerances also matter more because the new frame, façade and building services cannot be designed independently of an existing structure whose geometry is already fixed.

Selective demolition introduces its own temporary works and logistics requirements. Elements being retained need protection while adjacent fabric is removed, and intrusive surveys can reveal conditions that were not evident during design. The programme therefore depends on early decisions being carried through into demolition, structural connections and façade packages without repeated redesign.

The residential mix adds another layer of coordination. Student accommodation contains a large number of repeated bedrooms, bathrooms and service connections, while the social rent homes have different layouts and operational requirements. Retail, community uses and a public ground floor add separate access, servicing, fire and fit out interfaces below the residential floors.

Almost the entire ground floor is intended to face the public, including a community kitchen, high street retail and a courtyard garden. That limits the amount of space that can be treated as back of house and increases the need to coordinate permanent entrances, escape routes, refuse, deliveries and plant access with areas intended to remain visually open and publicly accessible.

The public-facing elements add measurable scope beyond the accommodation itself. Current appointment material identifies a 2,600 sq ft community kitchen, about 5,100 sq ft of high street retail and a 6,240 sq ft courtyard garden. Delivering those areas alongside 283 student rooms creates different quality and handover requirements within the same building, from repeatable bedroom fit out to bespoke community and landscape spaces. The scheme also has to maintain the intended pedestrian route through a 60-metre-long site, making the ground floor circulation strategy part of both construction logistics and the completed public realm.

The funding structure also reduces several of the uncertainties that can hold back large urban residential schemes. Planning is in place, enabling works have started, institutional capital is committed and the main construction contract has been awarded. The remaining risks are increasingly those of delivery: retained structure, design coordination, supply, cost control and programme performance.

Howells led the scheme through planning and RIBA Stage 3, with AFK acting as delivery architect and Harris Bugg Studio responsible for landscape design. The construction team therefore inherits a developed architectural and sustainability brief, but the detailed interfaces between retained concrete, new structure, envelope and services will determine whether the planned carbon savings survive the delivery process.

Completion in spring 2028 gives McLaren a defined construction horizon from the current enabling phase. The project now moves beyond financing and planning milestones into surveys, temporary works, sequencing, procurement and quality control, where the value of retaining the existing structure will be measured against the complexity it introduces on site.



  • Southern Housing awards £5.3m fire remediation contract

    Southern Housing awards £5.3m fire remediation contract

    Southern Housing has awarded a £5.3m fire remediation works contract. Architectural Decorators will act as principal contractor across three south London residential properties following earlier approval for replacement cladding and associated external wall works.


  • Woodlands Point tops out in Glasgow

    Woodlands Point tops out in Glasgow

    Woodlands Point has topped out on Glasgow’s St George’s Road. The six-storey, 262-bed student scheme now moves through façade, internal and landscaping work ahead of completion for the 2027 academic year.