NZC Solutions launches an embodied carbon platform for construction design. The tool supports early-stage material comparisons before specifications are fixed.
Blackwood has adopted Trimble automated dozer steering technology in Britain. The system uses 3D design data, GNSS, and onboard machine sensors.
Barhale has won a Thames Water tunnel maintenance programme contract. The AMP8 package covers inspections, repairs, and specialist access across strategic underground water assets.
Cemex cement has been specified for Benidorm’s TM Tower development. The lower-carbon product will be used in the foundations and structure of the 64-storey residential skyscraper.
Kobelco will trial remote construction machinery operation across Ukrainian reconstruction. The K-DIVE system will be tested for debris removal, safety, training, and maintenance.
Vinci has secured a major New Reims Hospital contract package. The €210m project will add a 58,000 sq m clinical building to the live hospital campus.
Hinkley Point C’s M&E programme has suffered fresh workforce disruption. The dispute involves clocking-in arrangements, safety concerns, and revised shift patterns at the nuclear construction site.
Paebbl has launched a near-white carbon-negative cement alternative construction material. Rebond 300 can replace conventional cement in standard mixes.
Build Warranty has launched native surveyor apps for mobile inspections. The tools are designed to speed reporting and stage sign-off.
Atlas Copco launches towable rapid charging station for construction sites. The FCS 220-240 targets electric plant and temporary power.