IN Brief:
- Tilbury Douglas has handed over the first phase of a two-storey steel-framed junior school project in Hucknall, Nottinghamshire.
- The project is being delivered for the Department for Education against the school building requirements known as Specification 21.
- A permanent multi-use games area and landscaping remain in the next phase, with the overall main-works programme continuing.
Tilbury Douglas has completed the first phase of Broomhill Junior School’s replacement building programme in Hucknall, Nottinghamshire, delivering a two-storey steel-framed facility for the Department for Education. The announcement marks completion of the principal new school building rather than the end of the entire site programme: permanent outdoor sports provision and landscaping are still to follow. The project is intended to replace older accommodation while maintaining educational use of the site through construction.
The school, on Broomhill Road, serves junior-age pupils from seven to 11. The completed building has been designed against the Department for Education’s Specification 21 requirements, the employer’s technical output requirements used for relevant school schemes procured through its construction arrangements. That reference describes a defined performance and delivery framework, rather than a particular structural system or a claim that every component has been standardised. Tilbury Douglas has identified the frame as steel, but has not released a detailed schedule of structural member sizes, façade systems or building-services plant in its completion announcement.
Work on an operating education site introduces a different sequence of constraints from an empty development plot. Contractors have to separate construction access and deliveries from pupil routes, manage changing pedestrian movements during the school day and coordinate any work affecting existing facilities. Chris Loach, regional director for the East Midlands at Tilbury Douglas, identified maintaining safe access and school facilities as part of the planning required for the project. The company has not published a detailed account of temporary traffic measures or the individual possession arrangements used, so those measures should not be assumed.
The transition from structural frame to a functioning learning environment also involves several distinct packages of work. A steel frame carries the building loads, but the envelope must provide weather protection, while internal partitions, circulation areas, mechanical and electrical services, fire precautions and finishes must be integrated and inspected before occupied use. At Broomhill, the announcement establishes completion of the first-phase building and compliance with the applicable DfE design brief; it does not identify individual manufacturers or justify claims about particular energy savings, prefabrication rates or embodied-carbon performance.
A separately published Department for Education procurement award records Tilbury Douglas as the main-works contractor in April 2025, with an award value of approximately £12.22m. That value relates to the recorded main construction contract, not solely to the phase announced in October. The procurement record gives a contract period extending into February 2027, consistent with outdoor and finishing work continuing after the main building milestone. It would therefore be incorrect to describe the present announcement as final completion of the full contract.
The physical division between the building and later external works is important for site management. A permanent multi-use games area requires its own construction and surfacing works, along with safe access, drainage considerations and interfaces with the rest of the school grounds. Landscaping has different establishment and protection requirements from the interior of a completed building. Those are normal construction considerations for such facilities; the school announcement does not specify the MUGA surface, drainage design, final planting schedule or the date on which those elements will be handed over.
Oakfield Construction has separately identified its involvement in the replacement school, describing work on the two-storey building and noting that the original accommodation dated from 1966. The project combines occupation of the new teaching spaces with continuing activity on the school grounds, so construction boundaries, pupil movement and access to outdoor provision need to be managed through the remaining phase. The October milestone concerns the new building; completion of the full external works programme has not been announced.
Tilbury Douglas says the next phase will provide the permanent multi-use games area and landscaping. The completed teaching building is the principal current milestone; the remaining works will determine when the full school site arrangement is finished. No revised final contract sum or confirmed date for complete site handover was provided with the phase-one announcement.



